Jumat, 13 Juli 2018

Sponsored Links

Testing Adjusting Balancing & Commissioning HVAC
src: 3.bp.blogspot.com

HVAC, Adjust and Balancing Testing (TAB) are the three main steps used to achieve proper HVAC (heating, ventilation and air conditioning) operation. TAB usually refers to the construction of commercial buildings and specialized contractors that employ personnel who perform these services. In general, TAB specialists perform air and hydronic measurements on HVAC systems and adjust the flow required to achieve optimal performance of the building's environmental equipment. The balancing is usually based on the design flow value required by the Mechanical Engineer for the project, and the TAB contractor submits a written report that summarizes testing and balancing and notes any deficiencies found during TAB work. Ensure that your TAB contractor holds current professional certification. See NBC, AABC, NEBB, TABB, or NBCTA.


Video Testing, adjusting, balancing



Test

Testing is the use of special and calibrated instruments to measure temperature, pressure, rotational speed, electrical characteristics, speed, and quantity of air and water for equipment evaluation and system performance.

Maps Testing, adjusting, balancing



Customize

Adjusting is the final arrangement of balancing devices such as silencers and valves, adjusting fan speed and pump impeller size, in addition to automatic control devices such as thermostats and pressure controllers to achieve maximum system performance and efficiency determined during normal operation.

Testing Adjusting Balancing & Commissioning HVAC
src: 1.bp.blogspot.com


Balancing

Balancing is a methodical arrangement of the flow of liquid systems (air or water) through the use of acceptable procedures to achieve desired or determined design airflow. When starting the system balance, you should find the terminal with the smallest number of streams in terms of drawing engineers. Once the "low" terminal has been found, you can proceed to adjust all the diffuser/grid (air) or the circuit equilibration valve (water) to proportionally match the original "low" terminal. There should be at least one wide-open terminal to achieve optimum efficiency.

Services | Testing & Balance Services | International Test & Balance
src: www.inttb.com


References

  • ASHRAE 111 - 2008 Practice for. Measurement,. Testing, Customizing, and. Balancing Building. Heating, Ventilation. Air conditioning, and. Cooling System. (www.ashrae.org)
  • Manual for Water & amp; Hydronic System Tests, Adjustments and Balancing , 1.5, 2016, Published by National Balancing Council, NBC
  • Procedural Standards for Testing Adjusting Environmental System Balancing , seventh edition, 2005, Published by NEBB
  • STANDARD PROCEDURES FOR TESTING ENVIRONMENTAL AND ENVIRONMENTAL CONDITIONS 2013 Eight Editions available for public comment

Testing, Adjusting and Balancing (TAB) of HVAC System รข€
src: www.ees-jo.com


Examples of Testing, Adjusting, and Balancing Companies

  • Environmental System Requirements & amp; Testing [www.provisionenvironmental.com] Located in East Tennessee

Source of the article : Wikipedia

Comments
0 Comments